All news


Photovoltaics for Calenberg

Calenberg attach great importance to sustainability and climate protection: new PV systems now produce environmentally friendly solar power at both locations.
06/01/23

10th Concrete Conference | Calenberg Ingenieure

The 10th Concrete Conference took place this year in Leipzig with about 30 exhibitors and engaging presentations. Calenberg Ingenieure was welcoming the visitors to its booth in Saxony's largest city at the sold-out event with an audience of 250.
12/12/22

Event Geluid, Trillingen en Luchtkwaliteit

KamPa B.V., Calenberg's Dutch partner company, focused on vibration isolation in the railway and building sector, was represented with a stand together with a Calenberg employee at the 25th congress "Geluid, Trillingen en Luchtkwaliteit" (Sound, Vibration and Air Quality) in Hoevelaken near Amersfoort.
11/11/22

Project Central Point in Warsaw

Central Point is a multi-storey office and service building with 26 floors on a total area of 21,000 m² located in the heart of Warsaw, put into use at 2021/2022. Its attractive location and great communication with the rest of the city is one of the key aspects of this investment.
01/11/22

New multifunctional sports arena in Munich’s Olympic Park – SAP garden

Calenberg elastomeric bearings were used for the static support of a six-storey multifunctional sports arena in the Olympic Park in Munich to guarantee permanent safety and stability for the highly stressed components.
20/10/22

Secure support with bi-Trapez Bearing® - Stuttgart Airport Tunnel

The airport tunnel in Stuttgart, which will probably be ready to go into operation in 2025, is a largely underground railway line that connects Stuttgart Airport railway station with the new Stuttgart-Wendlingen line and passes under the trade fair halls.
13/10/22

Are you ready for bauma 2022?

Will you be at bauma in Munich from 24 - 30 October? Visit us at booth 114, hall C1.
04/10/22

Don't miss out on the innoTrans 2022 event, September 20-23, Berlin

Hall 25 - Booth 130
Calenberg Ingenieure will be showcasing its advanced track systems for vibration protection and ballast conservation at InnoTrans 2022.
24/08/22

Vibration isolation of buildings in Munich

Since 2021, a construction project in Steinerstraße in Munich has been carried out according to plan.
18/08/22

Young talents at start

in July, two graduates from different universities presented their theses to an interested audience.
11/08/22
1 2 3 4 5 6 7 8 9
...
13